Divi Horizontal Timeline

Tell your story, left to right.

DG Horizontal Timeline is a Divi 5 timeline module: dates, milestones and steps on one line that people can swipe, drag or click through. Cards sit above, below or alternating, with photos, icons, numbers or avatars on the line. Ten real uses below, from company history to a fundraiser.

Step 1

Add the timeline

Drop DG Horizontal Timeline into any row.

Step 2

Add your moments

One child item per date, step or event.

Step 3

Pick a layout

Cards above, below or alternating.

Step 4

Style it

Markers, line, cards, arrows and dots.

Live examples

Explore 15 Divi timeline examples

Drag, swipe or use the arrows on each timeline. All ten are one DG Horizontal Timeline module with a different layout, marker and line style.

USE CASE 01 · LUXURY BRANDS & HERITAGE

Maison Verlaine, since 1872

One and a half centuries on a single gold thread. The years sit on the line in large serif type, the stories float above it, and each card fades into its marker.

Date: on the line, serif · Cards: above, hairline gold top · Connector: fade · Marker: ring · 4 in view

USE CASE 02 · ARCHITECTS & DESIGN STUDIOS

The making of Casa Lume

A project diary as clean as the drawings. Photos lead every card, a dashed line marks the build, and cards step up and down like a section drawing.

Cards: alternate, first below · Line: dashed · Marker: dot · Connector: line · Arrows: top right, square

Spring 2024

The site

A sloping olive grove facing the sea, and a brief for a house that disappears into it.

Autumn 2024

Concept & models

Forty clay models later: three stepped volumes under one long roof.

Winter 2025

Permits & details

Every window framed to a single tree, every wall in local limestone.

Summer 2025

On site

Fourteen months of building with a team of local masons and carpenters.

Autumn 2026

Handover

The family moved in with the first rain. The olive trees are all still there.

USE CASE 03 · SPACE, SCIENCE & DEEP TECH

Orbit-7: from launch to the Moon

A mission log that runs by itself. The glowing line fills as each phase moves to the centre, numbered markers light up, and glass cards float in deep space.

Marker: number, 42px glow · Highlight: centre · Autoplay: 3.5 s · Line: 4px cyan · Connector: dotted · Date: pill

T–72 h

Final checks

Rocket on the pad, fuel lines connected, crew in quarantine.

T+0

Lift-off

Nine engines, 7.6 million newtons of thrust and a perfect sky.

T+8 min

Orbit reached

Main engine cut-off at 200 km. The first stage lands back on the drone ship.

Day 1

Trans-lunar burn

Six minutes of thrust send Orbit-7 on its three-day coast to the Moon.

Day 4

Lunar orbit

Captured into a 100 km orbit. First colour images of the far side.

Day 6

Touchdown

A soft landing near the south pole, in the shadow of Shackleton crater.

USE CASE 04 · WINERIES, FARMS & SEASONS

A year in the vineyard

Two wide cards in view, a photo beside the words, and a burgundy ribbon on each corner for the season. As slow and warm as the wine itself.

Cards: below · Image: left of the text · Date: corner ribbon · Connector: pin · 2 in view · Arrows: bottom centre

March

Bud break

The first green shoots open on the old vines, and the frost watch begins.

June

Flowering

Ten quiet days that decide the size of the harvest. We hold our breath.

September

Harvest

Every bunch picked by hand at dawn, then sorted berry by berry in the shade.

November

Into the cellar

The new wine rests in French oak for eighteen months, under the house.

December

First tasting

Friends, family and the pickers taste the year together around one long table.

USE CASE 05 · FASHION & PRODUCT DROPS

The SS27 drop calendar

Tall lookbook photos above a slim dotted line, a boxed date for every drop and a little arrow pointing down to the day it lands. Drag it like a mood board.

Cards: above · Image: tall, top · Date: box · Line: dotted · Connector: arrow · 4 in view · Arrows: bottom right

Sunlit

Drop 01 · 12 Feb

Cotton tees, tinted shades and the colour of late afternoon.

Coastline

Drop 02 · 5 Mar

Linen layers made for wind, salt and long walks.

Noir

Drop 03 · 2 Apr

Wide brims, hard light and everything in black.

Verde

Drop 04 · 30 Apr

Crop tops and wide trousers in the green of new leaves.

City

Drop 05 · 28 May

Bomber jackets and stair-step tailoring for the summer streets.

USE CASE 06 · COMPANY HISTORY

From a kitchen table to 120 people

The classic “About us” timeline: a photo for each year, cards alternating above and below the line, arrows and dots to move through the years.

Cards: alternate · Media: photo · Marker: ring

From Reliable to Genuine a Branding Reviews

It starts at a kitchen table

Two friends, one laptop and a list of 40 local shops to call.

3 Hidden Improvement Tricks you should know

Our first real office

Six desks above a bakery. The smell of bread was free.

New York calling

Our first office abroad, and our first client with a skyline.

Home base in Lisbon

We moved the team to the sea, and never looked back.

Remote by choice

Half the team now works from 14 countries, coffee in hand.

Simplify like a Brilliant Operations expert

120 people strong

Still small enough to know every name and every dog.

USE CASE 07 · PRODUCT ROADMAP

What we shipped, and what’s next

Each quarter has its own marker icon and accent colour: green for shipped, amber for in progress, grey for planned. The date is a ribbon in the card’s corner.

Marker: icon per item · Date: ribbon · Accent: per item

Q1 2026

Dark mode

Every screen, every chart. Shipped in March.

Q2 2026

Team spaces

Shared boards with roles and guest links. Shipped.

Q3 2026

Offline mode

Work on a plane, sync when you land. In progress.

Q4 2026

AI summaries

One-click recaps of long threads. Planned.

Public API

Build your own tools on top. Planned.

USE CASE 08 · ORDER TRACKING

Where’s my parcel?

Five steps that always fit on the screen, so there is nothing to scroll: no arrows, no dots. Icons sit on the line, times sit under it, and the cards are see-through.

Items in view: 5 · Date: on the line · Cards: no background

USE CASE 09 · EVENT AGENDA

Design Summit · Day one

Speaker photos sit on the line as markers. The timeline moves on by itself every 4 seconds and stops when someone hovers over it.

Marker: speaker photo · Autoplay: 4 s, pause on hover · Date: box style

09:00

Opening keynote

Mia Torres · Why calm design wins

10:30

Type that talks

Kai Nakamura · Fonts with feelings

12:00

Lunch & demos

Garden terrace · 40 product demos

13:30

Shipping weekly

Daniel Park · Small teams, big rhythm

15:00

Design for trust

Emma Lind · Forms people finish

17:00

Sunset drinks

Rooftop · live DJ until 21:00

USE CASE 10 · WEDDING WEBSITE

Our story, Sofia & James

A soft, romantic timeline for a wedding site: heart icons on a fine line, tall portrait photos, and a pin connecting each card to its moment.

Marker: heart icon · Connector: pin · Line: thin

We met

A rainy book fair in Porto, the same book, one copy.

First trip

Ten days, one tent, a lot of laughing.

Moving in

A tiny flat with a big window and two plants.

The question

On the same bridge where we had our first walk.

I do

12 September · Quinta da Serra, Sintra.

USE CASE 11 · RÉSUMÉ

Ten years, five teams

A CV that reads like a story. Company logos sit on the line, the dates sit above each title, and all cards share one side.

Marker: logo image · Cards: above · Date: above the title

2016 – 2018

Junior designer · Northwind

Icons, banners and my first design system.

2018 – 2020

Product designer · Lumen

Shipped the mobile app to 2M people.

2020 – 2023

Senior designer · Fable

Led checkout. Conversion up 18%.

2023 – now

Design lead · Orbit

A team of six, and a lot of whiteboards.

USE CASE 12 · ONBOARDING

Get set up in five steps

Numbered markers count the steps for you, and each card ends with a button to the right page. Arrows sit at the bottom, under the steps.

Marker: number (auto) · Card: button · Arrows: bottom centre

2 min

Create your account

Name, email, password. That’s all.

1 min

Name your workspace

Pick a name and a colour for your team.

3 min

Invite your team

Send links, or paste a list of emails.

5 min

Import your data

From a spreadsheet, Trello or Notion.

Done!

Start your first project

Use a template or start from scratch.

USE CASE 13 · AGENCY PROCESS

How we work

Each phase gets a big icon at the top of its card, the line is dashed, and the markers are simple dots. Drag it with the mouse or swipe on a phone. Media: icon · Line: dashed · Marker: dot

WEEK 1

Discover

Workshops with your team. What hurts, what works.

WEEK 2

Define

One page: goals, users, and what success looks like.

WEEK 3–5

Design

Wireframes, then real screens you can click.

WEEK 6–9

Build

Clean code, tested on every phone in the office.

WEEK 10

Launch

Go live on a Tuesday. Never on a Friday.

ONGOING

Grow

Monthly check-ins, numbers and new ideas.

USE CASE 14 · TRAVEL ITINERARY

Seven days on the Portuguese coast

One card per day with a photo. The active day is held in the centre, cards sit above the line, and on phones it stays a swipeable strip. Highlight: centre · Phone: swipe · Cards: above

Day 1

Lisbon

Trams, tiles and custard tarts.

Day 2
Reliable Ideas for Quality in Education

Sintra hills

Palaces hiding in the fog.

Day 3
11 Expert-Level Methods to Strengthen your Science

Atlantic road

Windows down, music up.

Day 4
From Superior to Powerful a Technology Strategies

Comporta

Rice fields and empty beaches.

Day 5
Operations vs Architecture the Modern Schemes

Alentejo coast

Cliffs, storks and grilled fish.

Day 6
The Genuine Plans for Knowledge

Lagos

Kayak into the sea caves.

Day 7
4 Fantastic Insights to Conquer

Sagres sunset

The end of Europe, glowing.

USE CASE 15 · FUNDRAISER

€72,400 raised for 3 new wells

Milestones a charity has reached, and the ones still ahead. Reached milestones have filled markers and the progress line; the start is set to the last item, so visitors see the goal first.

Start at: last item · Marker: icon · Date: pill

€0

We start

March 1. A goal of €100,000 for three villages.

€10,000

First week

612 people gave. Thank you!

€35,000

Well no. 1 funded

Digging starts in Kisumu in May.

€72,400

We are here

Well no. 2 is almost there.

€100,000

The goal

Three wells, 4,000 people with clean water.